Zingzillas 2011

I am just about to start recording the second series of Zingzillas for CBeebies. I am grateful to have been chosen to light Zingzillas and I am looking forward to 4 weeks on Zingzillas island! 

(Added 25th October 2011) 

The recording of Zingzillas Series 3 is now complete. It was recorded in the Manchester stage at the Pie Factory studios at Salford Quays. We turned the stage into a fully working studio, with a lighting grid, and even a high level gantry. The first transmission will be on Monday the 21st of November!

 

Lighting Director: Andy Stagles

Vision Supervisor: David Knott,

Automate Lighting Operator: Mark Ninnim,

Gaffer: Neil Wallace,

Set Design: Sarah Milton 

Lighting provided by HSL and Provision,

Rigging provided by: Joe Porter Scaffolding, 

 

This is a screen grab from the the BBC Iplayer - Click here and look for series 3