| Zingzillas 2011 |
|
I am just about to start recording the second series of Zingzillas for CBeebies. I am grateful to have been chosen to light Zingzillas and I am looking forward to 4 weeks on Zingzillas island! (Added 25th October 2011) The recording of Zingzillas Series 3 is now complete. It was recorded in the Manchester stage at the Pie Factory studios at Salford Quays. We turned the stage into a fully working studio, with a lighting grid, and even a high level gantry. The first transmission will be on Monday the 21st of November!
Lighting Director: Andy Stagles Vision Supervisor: David Knott, Automate Lighting Operator: Mark Ninnim, Gaffer: Neil Wallace, Set Design: Sarah Milton Lighting provided by HSL and Provision, Rigging provided by: Joe Porter Scaffolding,
This is a screen grab from the the BBC Iplayer - Click here and look for series 3
|
| Zingzillas Series 4 03/01/2012 I am just about to start recording Zingzillas Series 4! Series 3 looked fantastic, so lets see what [ ... ] |
| The Christmas Lectures 2011 14/12/2011 I am currently at the Royal Institution of Great Britain recording the 2011 Christmas Lec [ ... ] |
Other Articles
|